Airport Art Steering Committee [1]
Agenda
Members of the Airport Art Steering Committee will attend this meeting remotely. Members of the public are invited to observe the meeting remotely online at: https://sfgov.webex.com/sfgov/j.php?MTID=mca0d482d6e373426189d045204623bb3 [2]
Airport Art Steering Committee Members:
Jose Almanza, Airport Commissioner
Mary Chou, Civic Art Collection and Public Art Program Director, SFAC
Jennifer McCabe, Chief Curator and Director, SFO Museum
Caryl Ito, Former Airport Commissioner
Roberto OrdeƱana, Former Arts Commissioner
Abby Sadin Schnair, Former Arts Commissioner
1. Approval of the March 5, 2025 Minutes
Discussion and Possible Action
Discussion and possible action to approve the Minutes of the Airport Art Steering Committee Meeting from March 5, 2025.
Explanatory Document: Draft Minutes from March 5, 2025
2. Terminal 3 West Modernization Public Art Project
Discussion and Possible Action
- Superhighway Integrated Wall
Discussion and possible action to approve the conceptual design proposal Infinite Regress: Oro en Paz I and II by Eamon Ore-Giron for the Terminal 3 West Superhighway Integrated Wall Public Art Project, as recommended by the Artist Review Panel.
- Suspended Sculpture
Discussion and possible action to approve the conceptual design proposal by Pae White for the Terminal 3 West Suspended Sculpture Public Art Project as recommended by the Artist Review Panel.
Staff Presenter: Senior Program Manager Amy Owen
Presentation Time: Approximately 10 minutes
Explanatory Document: Artwork Proposals
3. West Field Campus
Discussion and Possible Action
Discussion and possible action to approve the West Field Campus Public Art Program Plan of Approach, including West Field Garage 2 (670), Cargo Building 626.1, Cargo Building 720.1 and GSE 742.
Staff Presenter: Senior Program Manager Amy Owen
Presentation Time: Approximately 5 minutes
Explanatory Document: Preliminary Project Plan
4. Terminal 3 Connector 2D Artwork Program
Discussion and Possible Action
Discussion and possible action to approve the final layout design of two-dimensional artworks purchased for display at SFO Terminal 3 Connector corridor wall niches.
Staff Presenter: Project Manager Arianne G. Davidian
Presentation Time: Approximately 10 minutes
Explanatory Documents: Project Background; Artwork Images
Action
City Hall can be reached via public transportation: The nearest accessible BART station is Civic Center Plaza at the intersection of Market, Grove, and Hyde Streets. The accessible MUNI Metro lines are the J, K, L, M, and N (Civic Center Station or Van Ness Avenue Station). MUNI bus lines serving the area are the 47 Van Ness, the 49 Van Ness, 9 San Bruno, 5-Fulton, 6, 7, and 21-Hayes. Accessible curbside parking is available on 1 Dr. Carlton B. Goodlett Place and Grove Street. Visit SFMTA [7] to map your route.
City Hall is accessible to persons using wheelchairs and other assistive mobility devices. Wheelchair access is provided at the Grove, Van Ness and McAllister streets via ramps. Wheelchair access at the Polk Street/ Carlton B. Goodlett entrance is provided through a wheelchair lift. The hearing room is wheelchair accessible.
War Memorial Veterans Building can be reached via public transportation: The nearest accessible BART station is Civic Center Plaza at the intersection of Market, Grove, and Hyde Streets. The accessible MUNI Metro lines are the J, K, L, M, and N (Civic Center Station or Van Ness Avenue Station). MUNI bus lines serving the area are the 47 Van Ness, the 49 Van Ness, 9 San Bruno, 5-Fulton, 6, 7, and 21-Hayes. Visit SFMTA [7] to map your route.
War Memorial Veterans Building is accessible to persons using wheelchairs and other assistive mobility devices. The hearing room is wheelchair accessible.